Do you sign NDAs and support full ODM projects?
- Share
- Issue Time
- Nov 9,2026
An NDA is signed before any drawing exchange, which is standard procedure for custom housings and for brand-replacement projects where the original part is under a third-party design.
ODM projects run on the same 25-day development cycle using in-house mold, stamping and injection molding. Design input can start from a CAD model, a physical sample, or a constraint list such as height, card path and mounting method.